• INICIO
  • ACERCA DE CCL
    • VISIÓN Y MISIÓN
    • GOBIERNO CORPORATIVO
    • SEDES
    • APROBACIONES/CUMPLIMIENTO
    • MEMBRESÍAS Y AFILIACIONES
  • EXPERIENCIA
    • SOLUCIONES PARA LOSAS
    • POST-TENSADO
    • PREFABRICADO
    • REPARACIÓN Y REFORZAMIENTO
    • APOYOS PARA ESTRUCTURAS
    • GEOTÉCNICA
  • ESTRUCTURAS
    • EDIFICIOS
    • PUENTES
    • CONTENCIÓN
    • TURBINAS
    • ESTADIOS
    • PAVIMENTO DE LOSAS DE HORMIGÓN A NIVEL DEL SUELO (SOG)
  • SECTORES
    • COMERCIAL
    • RESIDENCIAL
    • SALUD
    • EDUCACIÓN
    • INDUSTRIAL
    • CENTROS COMERCIALES
    • CENTROS DE RECREACIÓN
    • TRANSPORTE E INFRAESTRUCTURA
    • MEDIO AMBIENTE
    • ENERGÍA Y SERVICIOS PÚBLICOS
  • DESCARGAS
    • FOLLETOS
    • ARTÍCULOS
    • Videos
    • CASOS DE ESTUDIO
  • RECURSOS HUMANOS
    • CCL NOSOTROS
    • OFERTAS DE EMPLEO
  • CONTÁCTENOS

The SportPark Loughborough University, UK

Developed by Sport England and Loughborough University, SportPark is an £11.5 million complex, which is home to the English national govering bodies of various sports, providing office space, storage areas and sports facilities.

Completed in 2009, the SportPark provides accommodation in a reinforced concrete-framed three-, four- and five-storey building complex. Each building is linked through glazed circulation spaces and provides the opportunity for shared practice and joint working. The project will cement Loughborough’s international reputation as one of the world’s great centres of sporting excellence.

Baggaley Construction, the main contractor, awarded the project to Northfield Construction, who commissioned CCL to undertake the post-tensioning design and installation element of the project. The majority of post-tensioning companies in the UK tendered for this project, however it was awarded to CCL due to the competitive price point combined with a high-quality package in terms of system, service and client support throughout this stage of the process.

CCL was ccommissioned to supply, install, stress and grout all the required post-tensioned slabs, using our bonded XF system - a recently CARES-approved new flat slab system. One of the important aspects of this project was that CCL ensured the supply of a staple-fee, post-tensioned system, as the slabs’ soffit was to be fair-faced exposed concrete.

 

  • Download Case Study
  • VOLVER ATRÁS
  • Loughborough Sports Park

    CONTÁCTENOS

    CCL
    Unit 8 Millennium Drive
    Leeds
    LS11 5BP
    United Kingdom

    T: +44 (0)113 270 1221
    E: enquiries@cclint.com

    PÓNGASE EN CONTACTO