• INICIO
  • ACERCA DE CCL
    • VISIÓN Y MISIÓN
    • GOBIERNO CORPORATIVO
    • SEDES
    • APROBACIONES/CUMPLIMIENTO
    • MEMBRESÍAS Y AFILIACIONES
  • EXPERIENCIA
    • SOLUCIONES PARA LOSAS
    • POST-TENSADO
    • PREFABRICADO
    • REPARACIÓN Y REFORZAMIENTO
    • APOYOS PARA ESTRUCTURAS
    • GEOTÉCNICA
  • ESTRUCTURAS
    • EDIFICIOS
    • PUENTES
    • CONTENCIÓN
    • TURBINAS
    • ESTADIOS
    • PAVIMENTO DE LOSAS DE HORMIGÓN A NIVEL DEL SUELO (SOG)
  • SECTORES
    • COMERCIAL
    • RESIDENCIAL
    • SALUD
    • EDUCACIÓN
    • INDUSTRIAL
    • CENTROS COMERCIALES
    • CENTROS DE RECREACIÓN
    • TRANSPORTE E INFRAESTRUCTURA
    • MEDIO AMBIENTE
    • ENERGÍA Y SERVICIOS PÚBLICOS
  • DESCARGAS
    • FOLLETOS
    • ARTÍCULOS
    • Videos
    • CASOS DE ESTUDIO
  • RECURSOS HUMANOS
    • CCL NOSOTROS
    • OFERTAS DE EMPLEO
  • CONTÁCTENOS

Heathrow Airport, Terminal 5, London, UK

One of Europe’s largest construction ventures, Terminal 5, was designed to handle around 30 million passengers a year. With 16 major projects and over 147 sub-projects, the scheme encompassed a vast and hugely complex programme of works.

CCL designed the bridge bearings for the on/off ramps to the specification of BAA. These were supplied to Watson Steel, who carried out the installation.

The on/off ramps provide rapid access from the new terminal to the adjacent car parks. They were designed to accommodate cars that run on tracks by ATS. Although the first of its type in the UK, it was hoped that this design could be developed as a means of transport in many urban areas.

Bearing design was undertaken by CCL Engineers, using the latest bespoke software to meet client specification, whilst ensuring the most economical configuration. CCL was awarded the project because of its extensive experience in the design and manufacture of bridge bearings and its ability to provide an effective solution, at a competitive price.

The design, manufacture and delivery of the bearings were all completed to a tight programme of works, ensuring the client’s schedule was maintained.

 

  • Download Case Study
  • VOLVER ATRÁS
  • Heathrow Airport

    CONTÁCTENOS

    CCL
    Unit 8 Millennium Drive
    Leeds
    LS11 5BP
    United Kingdom

    T: +44 (0)113 270 1221
    E: enquiries@cclint.com

    PÓNGASE EN CONTACTO